Cherokee Nation Durbin Feeling Language Center

Location
Tahlequah , Oklahoma
Services Provided
,
default
02 Building Front
03 Building Front
04 Driveway
05 Front inside
06 Front Entrance
07 Hallway
08 Hallway
09 Gym
10 Cable Pathway
11 Cable Pathway
12 Cable Pathway
13 Closet Cable Bundles
14 Cable Pathway
15 Back PP in Progress
16 Back PP in Progress
17 PP Progress
18 Cable Dressing
19 Cable Dressing
20 Cable Dressing
21 Cable Dressing
22 Back PP
23 Front PP
24 Boss Man
25 Front PP IDF-B
26 Front PP IDF-B
27 Back PP IDF-B
28 Back Rack IDF-B
29 Cable Dressing IDF-B
30 Cable Dressing IDF-B
31 Axis Door Bell
32 Valcom IP Speaker Clock
33 Valcom IP Clock
34 IDF-A Front Rack
35 Coax Field
36 Back of Rack IDF-B
37 Back of Rack Grounding
38 IDF-B Coax
39 IDF-B Font of Rack
40 IDF-B Front of Rack
41 IDF-A Asbuilts (2)
42 IDF-A Asbuilts
43 IDF-A Back Final
44 IDF-A Front Final
45 Outside Camera
46 Outside Pic
47 Outside Cameras
48 AC Panels
49 AC Panel Progress
50 AC Panel Progress
51 AC Panel Progress
52 AC Panel Progress (2)
53 AC Panel
Testimonials

Flintco / Cherokee Nation Vinita Health Clinic

On behalf of Flintco and the Cherokee Nation Vinita Project Team, we would like to thank LynxSystems and both Project Manager Bill Morgan and the Lead Technician for helping to successfully complete the Cherokee Nation Vinita Health Center. This was a fairly complex project with a huge scope the required a professional company such as themselves to… Read more “Flintco / Cherokee Nation Vinita Health Clinic”

Bill Spivey
Flintco Constructive Solutions

Aristocrat Technologies

We had the pleasure of working with David Ayers and LynxSystems on our new manufacturing facility in Tulsa, OK. Not only did the team complete our original scope on time and on budget, but they performed admirably beyond those basic requirements. Their cable management and attention to detail were truly top notch. They were patient… Read more “Aristocrat Technologies”

Kiley Adams
Aristocrat Technologies, Inc.

Tulsa Tech Phase 2

It is my pleasure to recognize Lynx Systems for their outstanding performance as the low voltage/fiber contractor for Tulsa Tech Phase 2 Project. Lynx Systems had a large project. They were able to perform this project with great skill. They did a great job of keeping Tulsa Tech staff in the loop on issues. As… Read more “Tulsa Tech Phase 2”

Eric Guthrie
Tulsa Tech